Tullow Oil, TEN Project (Partial Pipeline Design Scope)

Project Information

This was another successful High pressure High Temperature (HPHT), deep water project located offshore Ghana¬† in West Africa in water depth ranging between1400 m-2400 m. The project involved oil production pipelines,¬† gas export pipeline and associated gas production flowline. The major challenge was to keep the fluid above a certian stipluated arrival temperature. Therefore, a very low ‘U’ value ITP Pipe-in-Pipe pipeline system was used for the production flowlines and single pipe system was used for the gas export pipeline,

01

Client

Subsea7, UK

03

Date

July, 2015

02

Our Role

Subsea Pipeline Engineering Subcontractor

04

Category

Subsea Pipeline Engineering

img-04
img-03
img-02
img-04